Civil Works (Road Asphalting)
Civil Works (Oil Field Facility Generator House)
Civil Works (Five Floor Administrative Block Under Construction)
Pipeline Engineering (Mainline Pipeline Welding)
Fabrication (Floating Marine Jetty)
Civil Works (Road Asphalting)
Civil Works (Road Construction- Base Course Prep)
Fabrication (Blasted And Painted Vessel Undergoing Installation)
Fabrication (Welding Of Pig Launcher Major and Minor Barrel)
Lowering Of Welded Mainline Pipeline String
Fabrication (Vent Scrubber Undergoing Fabrication)
Fabrication (Instrument Gas Scrubber)
Fabrication (Welding Of Pig Launcher Major and Minor Barrel Saddle)
Fabrication (MV-Material Barge)
Marine Works (Shoreline Protection Using Reno Gabion Mattress And Boulders With Underlining Geotextile)
© Copyright 2018. Fabs Engineering Ltd. All rights reserved.